Sidewalk Repair Resolution – 7/21/2015
Resolution of the LCV Board at the 7/21/2015 meeting.
Resolution on concrete repair to sidewalks on Maine Road (8 units). After some discussion it was recommended that the contract specify smaller slabs and more expansion joints to minimize cracking. G. Eagan made a motion to have the contractor perform this work for a total of $19,006.70. S. Phillips seconded the motion. The motion was passed by all.